Dergi makalesi Açık Erişim
Murat, Yetis Sazi; Cakici, Ziya; Tian, Zong
{
"@context": "https://schema.org/",
"@id": 70533,
"@type": "ScholarlyArticle",
"creator": [
{
"@type": "Person",
"affiliation": "Pamukkale Univ, Fac Engn, Denizli, Turkey",
"name": "Murat, Yetis Sazi"
},
{
"@type": "Person",
"affiliation": "Bayburt Univ, Fac Engn, Bayburt, Turkey",
"name": "Cakici, Ziya"
},
{
"@type": "Person",
"affiliation": "Univ Nevada, Coll Engn, Dep Civil & Environm Engn, Reno, NV 89557 USA",
"name": "Tian, Zong"
}
],
"datePublished": "2019-01-01",
"description": "The relationship between the left-turning traffic volume and the storage area at signalised roundabouts is investigated, and a calculation procedure for signal timing is proposed in this paper. The parameters associated with the developing stages of a new expression/model are also defined. Four different signal timing scenarios are considered. The results show that the proposed formula can be used for the design of signalised roundabouts.",
"headline": "A signal timing assignment proposal for urban multi lane staged controlled signalised roundabouts",
"identifier": 70533,
"image": "https://aperta.ulakbim.gov.tr/static/img/logo/aperta_logo_with_icon.svg",
"license": "http://www.opendefinition.org/licenses/cc-by",
"name": "A signal timing assignment proposal for urban multi lane staged controlled signalised roundabouts",
"url": "https://aperta.ulakbim.gov.tr/record/70533"
}
| Görüntülenme | 47 |
| İndirme | 10 |
| Veri hacmi | 1.7 kB |
| Tekil görüntülenme | 40 |
| Tekil indirme | 10 |