Dergi makalesi Açık Erişim
Murat, Yetis Sazi; Cakici, Ziya; Tian, Zong
{ "@context": "https://schema.org/", "@id": 70533, "@type": "ScholarlyArticle", "creator": [ { "@type": "Person", "affiliation": "Pamukkale Univ, Fac Engn, Denizli, Turkey", "name": "Murat, Yetis Sazi" }, { "@type": "Person", "affiliation": "Bayburt Univ, Fac Engn, Bayburt, Turkey", "name": "Cakici, Ziya" }, { "@type": "Person", "affiliation": "Univ Nevada, Coll Engn, Dep Civil & Environm Engn, Reno, NV 89557 USA", "name": "Tian, Zong" } ], "datePublished": "2019-01-01", "description": "The relationship between the left-turning traffic volume and the storage area at signalised roundabouts is investigated, and a calculation procedure for signal timing is proposed in this paper. The parameters associated with the developing stages of a new expression/model are also defined. Four different signal timing scenarios are considered. The results show that the proposed formula can be used for the design of signalised roundabouts.", "headline": "A signal timing assignment proposal for urban multi lane staged controlled signalised roundabouts", "identifier": 70533, "image": "https://aperta.ulakbim.gov.tr/static/img/logo/aperta_logo_with_icon.svg", "license": "http://www.opendefinition.org/licenses/cc-by", "name": "A signal timing assignment proposal for urban multi lane staged controlled signalised roundabouts", "url": "https://aperta.ulakbim.gov.tr/record/70533" }
Görüntülenme | 36 |
İndirme | 8 |
Veri hacmi | 1.3 kB |
Tekil görüntülenme | 31 |
Tekil indirme | 8 |