Dergi makalesi Açık Erişim

A signal timing assignment proposal for urban multi lane staged controlled signalised roundabouts

Murat, Yetis Sazi; Cakici, Ziya; Tian, Zong


JSON

{
  "conceptrecid": "70532", 
  "created": "2021-03-16T03:16:53.048899+00:00", 
  "doi": "10.14256/JCE.2323.2018", 
  "files": [
    {
      "bucket": "791092ed-f2e5-4d9b-bdc1-26d702cad8eb", 
      "checksum": "md5:10aa5237f05a7292b270ba350d9c65b9", 
      "key": "bib-65cb502d-e4ba-45e6-8651-cecfa22fa414.txt", 
      "links": {
        "self": "https://aperta.ulakbim.gov.tr/api/files/791092ed-f2e5-4d9b-bdc1-26d702cad8eb/bib-65cb502d-e4ba-45e6-8651-cecfa22fa414.txt"
      }, 
      "size": 167, 
      "type": "txt"
    }
  ], 
  "id": 70533, 
  "links": {
    "badge": "https://aperta.ulakbim.gov.tr/badge/doi/10.14256/JCE.2323.2018.svg", 
    "bucket": "https://aperta.ulakbim.gov.tr/api/files/791092ed-f2e5-4d9b-bdc1-26d702cad8eb", 
    "doi": "https://doi.org/10.14256/JCE.2323.2018", 
    "html": "https://aperta.ulakbim.gov.tr/record/70533", 
    "latest": "https://aperta.ulakbim.gov.tr/api/records/70533", 
    "latest_html": "https://aperta.ulakbim.gov.tr/record/70533"
  }, 
  "metadata": {
    "access_right": "open", 
    "access_right_category": "success", 
    "communities": [
      {
        "id": "tubitak-destekli-proje-yayinlari"
      }
    ], 
    "creators": [
      {
        "affiliation": "Pamukkale Univ, Fac Engn, Denizli, Turkey", 
        "name": "Murat, Yetis Sazi"
      }, 
      {
        "affiliation": "Bayburt Univ, Fac Engn, Bayburt, Turkey", 
        "name": "Cakici, Ziya"
      }, 
      {
        "affiliation": "Univ Nevada, Coll Engn, Dep Civil & Environm Engn, Reno, NV 89557 USA", 
        "name": "Tian, Zong"
      }
    ], 
    "description": "The relationship between the left-turning traffic volume and the storage area at signalised roundabouts is investigated, and a calculation procedure for signal timing is proposed in this paper. The parameters associated with the developing stages of a new expression/model are also defined. Four different signal timing scenarios are considered. The results show that the proposed formula can be used for the design of signalised roundabouts.", 
    "doi": "10.14256/JCE.2323.2018", 
    "has_grant": false, 
    "journal": {
      "issue": "2", 
      "pages": "113-124", 
      "title": "GRADEVINAR", 
      "volume": "71"
    }, 
    "license": {
      "id": "cc-by"
    }, 
    "publication_date": "2019-01-01", 
    "relations": {
      "version": [
        {
          "count": 1, 
          "index": 0, 
          "is_last": true, 
          "last_child": {
            "pid_type": "recid", 
            "pid_value": "70533"
          }, 
          "parent": {
            "pid_type": "recid", 
            "pid_value": "70532"
          }
        }
      ]
    }, 
    "resource_type": {
      "subtype": "article", 
      "title": "Dergi makalesi", 
      "type": "publication"
    }, 
    "title": "A signal timing assignment proposal for urban multi lane staged controlled signalised roundabouts"
  }, 
  "owners": [
    1
  ], 
  "revision": 1, 
  "stats": {
    "downloads": 8.0, 
    "unique_downloads": 8.0, 
    "unique_views": 27.0, 
    "version_downloads": 8.0, 
    "version_unique_downloads": 8.0, 
    "version_unique_views": 27.0, 
    "version_views": 31.0, 
    "version_volume": 1336.0, 
    "views": 31.0, 
    "volume": 1336.0
  }, 
  "updated": "2021-03-16T03:16:53.100861+00:00"
}
31
8
görüntülenme
indirilme
Görüntülenme 31
İndirme 8
Veri hacmi 1.3 kB
Tekil görüntülenme 27
Tekil indirme 8

Alıntı yap