Dergi makalesi Açık Erişim
Aydemir, E.; Koruca, H., I
{
"conceptrecid": "79794",
"created": "2021-03-16T05:25:14.678555+00:00",
"doi": "10.2507/IJSIMM14(3)7.299",
"files": [
{
"bucket": "13f2cb3d-7041-416a-b98f-420545db5af2",
"checksum": "md5:98f05c92c4e7263c9f3cab9db5595c6d",
"key": "10-2507-ijsimm14-3-7-299.pdf",
"links": {
"self": "https://aperta.ulakbim.gov.tr/api/files/13f2cb3d-7041-416a-b98f-420545db5af2/10-2507-ijsimm14-3-7-299.pdf"
},
"size": 360952,
"type": "pdf"
}
],
"id": 79795,
"links": {
"badge": "https://aperta.ulakbim.gov.tr/badge/doi/10.2507/IJSIMM14%283%297.299.svg",
"bucket": "https://aperta.ulakbim.gov.tr/api/files/13f2cb3d-7041-416a-b98f-420545db5af2",
"doi": "https://doi.org/10.2507/IJSIMM14(3)7.299",
"html": "https://aperta.ulakbim.gov.tr/record/79795",
"latest": "https://aperta.ulakbim.gov.tr/api/records/79795",
"latest_html": "https://aperta.ulakbim.gov.tr/record/79795"
},
"metadata": {
"access_right": "open",
"access_right_category": "success",
"communities": [
{
"id": "tubitak-destekli-proje-yayinlari"
}
],
"creators": [
{
"affiliation": "Suleyman Demirel Univ, Fac Engn, Dept Ind Engn, TR-32260 Isparta, Turkey",
"name": "Aydemir, E."
},
{
"affiliation": "Suleyman Demirel Univ, Fac Engn, Dept Ind Engn, TR-32260 Isparta, Turkey",
"name": "Koruca, H., I"
}
],
"description": "Production scheduling is an important function that determines the efficiency and productivity of a production system. Many optimization methods, techniques, tools, and heuristics have been used to solve production scheduling problems, accordingly priority rules are implemented for customers' orders in real-world applications. Simulations and heuristic methods are quite useful for making decisions, and they are used mostly to design and improve production systems by reducing their complexity. In this study, a Priority Rule-Based Genetic Algorithm Scheduling (PRGA-Sched) module was developed to provide shorter total completion time in production scheduling. The module was integrated with the Faborg-Sim simulation tool. As a case study, a heating boiler manufacturing system was analyzed and simulated with six products and customers' orders by using production data from the PRGA-Sched module in Faborg-Sim. The results showed that a shorter total completion time is obtained and saved than the initial situation by via PRGA-Sched module.",
"doi": "10.2507/IJSIMM14(3)7.299",
"has_grant": false,
"journal": {
"issue": "3",
"pages": "450-462",
"title": "INTERNATIONAL JOURNAL OF SIMULATION MODELLING",
"volume": "14"
},
"license": {
"id": "cc-by"
},
"publication_date": "2015-01-01",
"relations": {
"version": [
{
"count": 1,
"index": 0,
"is_last": true,
"last_child": {
"pid_type": "recid",
"pid_value": "79795"
},
"parent": {
"pid_type": "recid",
"pid_value": "79794"
}
}
]
},
"resource_type": {
"subtype": "article",
"title": "Dergi makalesi",
"type": "publication"
},
"title": "A NEW PRODUCTION SCHEDULING MODULE USING PRIORITY-RULE BASED GENETIC ALGORITHM"
},
"owners": [
1
],
"revision": 1,
"stats": {
"downloads": 95.0,
"unique_downloads": 92.0,
"unique_views": 195.0,
"version_downloads": 95.0,
"version_unique_downloads": 92.0,
"version_unique_views": 190.0,
"version_views": 193.0,
"version_volume": 34290440.0,
"views": 198.0,
"volume": 34290440.0
},
"updated": "2021-03-16T05:25:14.727150+00:00"
}
| Görüntülenme | 198 |
| İndirme | 95 |
| Veri hacmi | 34.3 MB |
| Tekil görüntülenme | 195 |
| Tekil indirme | 92 |