Dergi makalesi Açık Erişim
Kang, Yongha; Albey, Erinc; Hwang, Sangwook; Uzsoy, Reha
{ "conceptrecid": "65204", "created": "2021-03-16T02:04:38.054900+00:00", "doi": "10.1016/j.jmsy.2014.04.003", "files": [ { "bucket": "26850169-a9c4-48e0-a3e3-0f6e279f45e6", "checksum": "md5:1029b8d3138bf760a153844002404442", "key": "bib-de0a1971-7859-4b5a-96d0-3f3ded6b9119.txt", "links": { "self": "https://aperta.ulakbim.gov.tr/api/files/26850169-a9c4-48e0-a3e3-0f6e279f45e6/bib-de0a1971-7859-4b5a-96d0-3f3ded6b9119.txt" }, "size": 175, "type": "txt" } ], "id": 65205, "links": { "badge": "https://aperta.ulakbim.gov.tr/badge/doi/10.1016/j.jmsy.2014.04.003.svg", "bucket": "https://aperta.ulakbim.gov.tr/api/files/26850169-a9c4-48e0-a3e3-0f6e279f45e6", "doi": "https://doi.org/10.1016/j.jmsy.2014.04.003", "html": "https://aperta.ulakbim.gov.tr/record/65205", "latest": "https://aperta.ulakbim.gov.tr/api/records/65205", "latest_html": "https://aperta.ulakbim.gov.tr/record/65205" }, "metadata": { "access_right": "open", "access_right_category": "success", "communities": [ { "id": "tubitak-destekli-proje-yayinlari" } ], "creators": [ { "affiliation": "Samsung SDS, Device MES Automat Grp, Songnam, South Korea", "name": "Kang, Yongha" }, { "affiliation": "N Carolina State Univ, Edward P Fitts Dept Ind & Syst Engn, Raleigh, NC 27695 USA", "name": "Albey, Erinc" }, { "affiliation": "Wyndham Exchange & Rentals, Parsippany, NJ 07054 USA", "name": "Hwang, Sangwook" }, { "affiliation": "N Carolina State Univ, Edward P Fitts Dept Ind & Syst Engn, Raleigh, NC 27695 USA", "name": "Uzsoy, Reha" } ], "description": "We present a production planning model for a multiple product single machine dynamic lot-sizing problem with congestion. Using queuing models, we develop a set of functions to capture the nonlinear relationship between the output, lot sizes and available work in process inventory levels of all products in the system. We then embed these functions in a nonlinear optimization model with continuous variables, and construct an approximate solution to the original problem by rounding the resulting fractional solution. Computational experiments show that our model with congestion provides significantly better flow time and inventory performance than a benchmark model that does not consider the effects of congestion. These advantages arise from the use of multiple smaller lots in a period instead of a single large lot as suggested by conventional fixed-charge models without congestion. (C) 2014 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.", "doi": "10.1016/j.jmsy.2014.04.003", "has_grant": false, "journal": { "issue": "3", "pages": "436-444", "title": "JOURNAL OF MANUFACTURING SYSTEMS", "volume": "33" }, "license": { "id": "cc-by" }, "publication_date": "2014-01-01", "relations": { "version": [ { "count": 1, "index": 0, "is_last": true, "last_child": { "pid_type": "recid", "pid_value": "65205" }, "parent": { "pid_type": "recid", "pid_value": "65204" } } ] }, "resource_type": { "subtype": "article", "title": "Dergi makalesi", "type": "publication" }, "title": "The impact of lot-sizing in multiple product environments with congestion" }, "owners": [ 1 ], "revision": 1, "stats": { "downloads": 5.0, "unique_downloads": 5.0, "unique_views": 27.0, "version_downloads": 5.0, "version_unique_downloads": 5.0, "version_unique_views": 27.0, "version_views": 28.0, "version_volume": 875.0, "views": 28.0, "volume": 875.0 }, "updated": "2021-03-16T02:04:38.105495+00:00" }
Görüntülenme | 28 |
İndirme | 5 |
Veri hacmi | 875 Bytes |
Tekil görüntülenme | 27 |
Tekil indirme | 5 |