Published January 1, 2018
| Version v1
Conference paper
Open
Construction of Maxwell-Wien Bridge at SASO-NMCC
Creators
- 1. Natl Measurement & Calibrat Ctr, POB 3437, Riyadh 11471, Saudi Arabia
- 2. TUBITAK, UME, PK 54, TR-41470 Gebze, Kocaeil, Turkey
Description
An inductance calibration system for standard inductors based on a Maxwell-Wien bridge has been constructed at Saudi Standards Metrology and Quality Organization, National Measurement and Calibration Center (SASO NMCC). Expanded measurement uncertainty has been estimated to be less than 20 mu H/H for 100 mH inductance at 1 kHz. A bilateral comparison between SASO NMCC and TUBITAK UME has been performed in order to evaluate the performance of the calibration system.
Files
bib-d407ecda-6c9e-408c-89b4-c1ae26f2ac58.txt
Files
(213 Bytes)
| Name | Size | Download all |
|---|---|---|
|
md5:13f6c4d5493c66ede79dc72e86c69e7f
|
213 Bytes | Preview Download |