Published January 1, 2015 | Version v1
Journal article Open

Identifying the time of a step change with multivariate single control charts

Creators

Description

Change point estimation procedures simplify the efforts to search for and identify special causes in multivariate statistical process monitoring. After a signal is generated by the simultaneously used control charts or a single control chart, add-on change point procedure estimates the time of the change. In this study, multivariate joint change point estimation performance for simultaneous monitoring of both location and dispersion is compared under the assumption that various single charts are used to monitor the process. The change detection performance for several structural changes for the mean vector and covariance matrix is also discussed. It is concluded that choice of the control chart to obtain a signal may affect the change point detection performance.

Files

bib-9d36b3f5-3ce7-4567-bf5e-8153506001c3.txt

Files (164 Bytes)

Name Size Download all
md5:2a26a29a9b48ea7e7971f5b24087bc39
164 Bytes Preview Download