Published January 1, 2015 | Version v1
Journal article Open

A NEW PRODUCTION SCHEDULING MODULE USING PRIORITY-RULE BASED GENETIC ALGORITHM

  • 1. Suleyman Demirel Univ, Fac Engn, Dept Ind Engn, TR-32260 Isparta, Turkey

Description

Production scheduling is an important function that determines the efficiency and productivity of a production system. Many optimization methods, techniques, tools, and heuristics have been used to solve production scheduling problems, accordingly priority rules are implemented for customers' orders in real-world applications. Simulations and heuristic methods are quite useful for making decisions, and they are used mostly to design and improve production systems by reducing their complexity. In this study, a Priority Rule-Based Genetic Algorithm Scheduling (PRGA-Sched) module was developed to provide shorter total completion time in production scheduling. The module was integrated with the Faborg-Sim simulation tool. As a case study, a heating boiler manufacturing system was analyzed and simulated with six products and customers' orders by using production data from the PRGA-Sched module in Faborg-Sim. The results showed that a shorter total completion time is obtained and saved than the initial situation by via PRGA-Sched module.

Files

10-2507-ijsimm14-3-7-299.pdf

Files (361.0 kB)

Name Size Download all
md5:98f05c92c4e7263c9f3cab9db5595c6d
361.0 kB Preview Download