EVALUATION OF PLASTERING CREW PERFORMANCE IN BUILDING PROJECTS USING DATA ENVELOPMENT ANALYSIS

  • 1. Adana Sci & Technol Univ, Engn & Nat Sci Fac, Civil Engn Dept, Adana, Turkey
  • 2. Mustafa Kemal Univ, Fac Engn, Dept Civil Engn, TR-31200 Iskenderun, Hatay, Turkey
  • 3. Mustafa Kemal Univ, Antakya Vocat Coll, Antakya, Hatay, Turkey
  • 4. Wayne State Univ, Dept Civil & Environm Engn, Detroit, MI 48202 USA

Description

The research question addressed in this study was how the performance of construction crews working in a certain project or locality could be evaluated, ranked and improved. To develop and demonstrate the relevant framework, data envelopment analysis (DEA) was applied to establish the relative efficiency of plastering crews working in building projects located in different cities around Turkey. Data were collected from 40 crews of varying characteristics, and their technical efficiency scores were computed using the Banker, Charnes and Cooper (BCC) model, which is based on variable returns-to-scale (VRS). The model yields efficiency scores that range between 0 and 1, and a company or crew is considered efficient if its score is 1.0 (100%). Efficient and inefficient crews were identified and ranked on this basis in the study. Cross tabulation analyses were subsequently conducted to gain further insights into the relationships between the efficiency scores and input factors of numbers of skilled and unskilled laborers, daily labor unit costs, work hours, average age of crew members, total crew experience, plastering location, plastering technique, and plaster type. No discernible relationship could be identified between the efficiency scores and productivity outputs of the crews. It was found that plastering technique, plastering location, and total crew experience had a significant association with crew efficiency. Efficiency improvement strategies identified included training, hiring experienced plasterers, adopting more advanced plastering technology, implementing better jobsite management practices, and enhancing workers' knowledge, skills and attitude towards productivity and quality.

Files

bib-2206a3e3-42f3-4ded-931a-7b4a71aa96e4.txt

Files (219 Bytes)

Name Size Download all
md5:bbd6c76e6ac46ada177ae2ca03cd3605
219 Bytes Preview Download