Yayınlanmış 1 Ocak 2016 | Sürüm v1
Dergi makalesi Açık

Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time-Cost Trade-Off Problem

  • 1. Middle E Tech Univ, Dept Civil Engn, TR-06531 Ankara, Turkey
  • 2. Minist Dev, Necatibey Caddesi 110-A, TR-06570 Ankara, Turkey

Açıklama

Despite the importance of project deadlines and resource constraints in construction scheduling, very little success has been achieved in solving the resource-constrained discrete time-cost trade-off problem (RCDTCTP), especially for large-scale projects. In this paper a new heuristic method is designed and developed to achieve fast and high-quality solutions for the large-scale RCDTCTP. The proposed method is based on the novel principles to enable effective exploration of the search space through adequate selection of the activities to be crashed for a resource constrained schedule, by only crashing the activities with zero float in a resource constrained-schedule, which form the critical sequence. The computational experiment results reveal that the new critical sequence crashing heuristic outperforms the state-of-the-art methods, both in terms of the solution quality concerning project cost and computation time. Solutions with a deviation of 0.25% from the best known solutions are achieved within seconds for the first time, for a large-scale project including up to 2,000 activities. The main contribution of the new heuristic to practitioners and researchers is that it provides a fast and effective method for optimal scheduling of real-life-size construction projects with project deadlines and resource constraints. (C) 2015 American Society of Civil Engineers.

Dosyalar

bib-725fd633-5c91-457e-8121-b13de9c5a03b.txt

Dosyalar (203 Bytes)

Ad Boyut Hepisini indir
md5:582ba5e9a4813b784c9fa43d166e69dd
203 Bytes Ön İzleme İndir