Published January 1, 2017 | Version v1
Journal article Open

Optimisation of dragline inspection intervals with time-counter algorithm

  • 1. Colorado Sch Mines, Dept Min Engn, Golden, CO 80401 USA
  • 2. Middle East Tech Univ, Dept Min Engn, Ankara, Turkey

Description

This research study proposed a novel algorithm, called time-counter, to optimise inspection intervals of production systems. The developed algorithm was applied to two active draglines. The algorithm evaluated random uptime/downtime characteristics of the draglines and the planned dragline halts in the mine. Physical and random non-physical costs were included and annual maintenance cost minimisation was achieved. Dragline-1 and Dragline-2 inspection intervals were optimised as 232 and 184 h and their maintenance costs were reduced by 5.9 and 6.2% compared to the current interval, respectively. This study is the first initiative in cost-effective inspection interval optimisation of a mining machinery.

Files

bib-7ccd9e90-edfb-43cf-a4f2-b26e0fe09be2.txt

Files (185 Bytes)

Name Size Download all
md5:fbb0368e7c0837943d0945ca8e092904
185 Bytes Preview Download