Published January 1, 2009 | Version v1
Journal article Open

Scheduling problems with the nonlinear effects of learning and deterioration

  • 1. Erciyes Univ, Dept Ind Engn, Kayseri, Turkey
  • 2. Gazi Univ, Dept Ind Engn, Ankara, Turkey

Description

In this paper, we present both nonlinear job deterioration and nonlinear learning which exist simultaneously. Job deterioration and learning co-exist in many realistic scheduling situations. By the effects of learning and deterioration, we mean that the processing time of a job is defined by the increasing function of its execution start time and position in the sequence. The following objectives are considered: single-machine makespan and sum of completion times (square) and the maximum lateness. For the single-machine case, we derive polynomial time optimal solutions. For the case of an m-machine permutation flowshop, we present polynomial time optimal solutions for some special cases of the problems to minimize makespan and total completion time.

Files

bib-8a765ba2-62cd-4c3e-bed3-131a3f9ecc18.txt

Files (187 Bytes)

Name Size Download all
md5:99af2c29fccd64dd140a20d78a42340e
187 Bytes Preview Download