Published January 1, 2022 | Version v1
Journal article Open

Critical speed calculation of a refurbishment of 11MW hydro power plant unit

  • 1. TUBITAK Marmara Res Ctr, Energy Inst, TR-41470 Kocaeli, Turkey
  • 2. KONCAR GIM, Zagreb 10000, Croatia
  • 3. Sabanci Univ, TR-34956 Istanbul, Turkey

Description

Hydro generator design is a significant issue in terms of safety, efficiency, and energy production sustainability. One of the most crucial issues about design criteria is to satisfy the needs of the project's critical speed. In this work, the critical speed calculation of an 11 MW hydro power plant was investigated with several design steps. Numerical solution methodologies were implemented using ARMDT. A generator design was developed, and the implementation of the rotor was carried out in Antalya, Turkey. Vibration and displacements of the hydro generator are adequate. The generator unit is active for 3 years and have never encountered runaway speeds. No critical speed or resonance speed is anticipated for the designed hydro generator unit.

Files

bib-408d08a0-3264-483f-acd7-c733a31482e8.txt

Files (221 Bytes)

Name Size Download all
md5:80edd149715a0ccffde20f14a2e03b3f
221 Bytes Preview Download