Published January 1, 2020 | Version v1
Journal article Open

Activity Uncrashing Heuristic with Noncritical Activity Rescheduling Method for the Discrete Time-Cost Trade-Off Problem

  • 1. Middle East Tech Univ, Dept Civil Engn, TR-06531 Ankara, Turkey
  • 2. Atilim Univ, Dept Civil Engn, TR-06830 Ankara, Turkey
  • 3. Bahcesehir Univ, Dept Ind Engn, TR-34353 Istanbul, Turkey

Description

Despite intensive research efforts that have been devoted to discrete time-cost optimization of construction projects, the current methods have very limited capabilities for solving the problem for real-life-sized projects. This study presents a new activity uncrashing heuristic with noncritical activity rescheduling method to narrow the gap between the research and practice for time-cost optimization. The uncrashing heuristic searches for new solutions by uncrashing the critical activities with the highest cost-slope. This novel feature of the proposed heuristic enables identification and elimination of the dominated solutions during the search procedure. Hence, the heuristic can determine new high-quality solutions based on the nondominated solutions. Furthermore, the proposed noncritical activity rescheduling method of the heuristic decreases the amount of scheduling calculations, and high-quality solutions are achieved within a short CPU time. Results of the computational experiments reveal that the new heuristic outperforms state-of-the-art methods significantly for large-scale single-objective cost minimization and Pareto front optimization problems. Hence, the primary contribution of the paper is a new heuristic method that can successfully achieve high-quality solutions for large-scale discrete time-cost optimization problems.

Files

bib-08503f15-53fa-4b81-9ccd-54f72e894159.txt

Files (227 Bytes)

Name Size Download all
md5:689048d56d9209ecf8994776ababf528
227 Bytes Preview Download