Published January 1, 1998
| Version v1
Conference paper
Open
An environmental impact assessment and environmental management model for an industrial case in Turkey
Creators
Description
This study is based on the environmental impact assessment (EIA) and environmental management system (EMS) for an integrated cement factory which is to be established in the city of Burdur located in the central Anatolia region of Turkey. The EIA for the plant was carried out in compliance with the format suggested for cement factories by the Turkish Ministry of Environment. The boundaries of the area under assessment were determined by considering the possible interaction of die plant activities with the physical, biological economical, and social environment. The waste that may be produced during building the plant and when it is operational was estimated, and its possible short and long term effects on the bio-physical and socio-economical environment were determined using computer models, and the experimental and statistical data obtained from the similar existing establishments. The necessary measures to eliminate the waste that may be produced at various stages, and the required purification techniques were determined.
Files
bib-6b18c633-8ef1-424b-b260-e9f97900388c.txt
Files
(204 Bytes)
| Name | Size | Download all |
|---|---|---|
|
md5:84fef9b036d1a3017daf9f71798b1d0a
|
204 Bytes | Preview Download |