Dergi makalesi Açık Erişim

An Economic Model for the Revamping of a Pulverized Coal-fired Boiler

   Cetin, B.

Equipping existing thermal power plants (TPPs) with newer technologies, such as fluidized bed combustion (FBC), is vital for many countries due to concerns about the economy, the environment, and energy policy. First, this study presents a general model for economic analysis of the revamping of a pulverized coal-fired boiler with FBC. Second, the developed model is applied to a 140 MW pulverized coal-fired TPP. Third, the payback period (PBP) is calculated by using the net present value (NPV) method. Finally, the effects of almost all technical and economic parameters, such as power loss, electricity price, and escalation rate are investigated on PBP and NPV. As a result, the outcomes of this study show that power loss has a significant effect on PBP and NPV.

Dosyalar (156 Bytes)
Dosya adı Boyutu
bib-fab98988-2600-4e2a-b2df-6edb9b65658f.txt
md5:131301fce549914cd738f6d5249a3b4b
156 Bytes İndir
20
5
görüntülenme
indirilme
Görüntülenme 20
İndirme 5
Veri hacmi 780 Bytes
Tekil görüntülenme 16
Tekil indirme 5

Alıntı yap