Published January 1, 2018 | Version v1
Conference paper Open

Two-Stage Cutting Stock Problem with Due Dates

  • 1. Bahcesehir Univ, Dept Ind Engn, TR-34353 Istanbul, Turkey
  • 2. Univ Bath, Sch Management, Bath BA2 7AY, Avon, England

Description

In this study, we consider a scheduling extension for the two-stage cutting stock problem with the integration of order due dates. The two-stage cutting stock problem arises when technical restrictions inhibit demanded items to be cut from stock rolls directly, and hence require the cutting process to be done in two subsequent stages. The mathematical model proposed for the due date extension aims to determine a cutting plan which not only minimizes the number of stock rolls used but also reduces tardiness and earliness costs incurred. Preliminary results have shown that the modeling approach used is capable of overcoming difficulties caused by the dependencies between stages.

Files

bib-05c8dd15-b835-409f-85c2-da366d7fff1a.txt

Files (114 Bytes)

Name Size Download all
md5:6af4c5cc3cbc2ced782cda5a977c5b9c
114 Bytes Preview Download